Client & Project List

City of Riverside

We have conducted work on many projects for the City of Riverside Public Works and Real Estate Development Departments. This work includes Preliminary Geotechnical Investigations, Percolation Feasibility Studies, Phase I Environmental Site Assessments Phase II Environmental Site Assessment, Lead-Based Paint Surveys, and a wide variety of Construction Materials Testing Services.

We have provided observation and testing services for the backfilling of infrastructural utilities, including sewer mains and waterlines, street and parking lot structural sections, and dry utilities. We also have conducted testing and inspections during placement of asphalt concrete and for Portland Cement Concrete for many City of Riverside projects.

We have been awarded over 100 projects and have contracted over $500,000 in the past eight years. We have also been chosen for the Annual On-Call Geotechnical Service Agreement for several years running. Some of these projects include:

      Tyler Street Improvements

      1 Block Downtown Project, 13th, 14th, and Main Streets

      Golden Star Park Site

      Five Point Property Land Assembly

      Mission Avenue Street Improvements

      14th Street Roadway Widening

      University Avenue Sewer Replacement

      University Wash Channel

      Stage 4, Sewer Capacity Improvement

      Riverside Canal Rehabilitation Project North and South Reach Areas

      Dewey Avenue Street Improvements

      Market Street Improvements

      Auto Center Municipal Corporation Yard

      Jurupa Avenue Underpass Improvements Phase I

      Whitegates No. 2 Four Million Gallon Buried Reinforced Concrete Potable Reservoir & Booster Station

      Tippacanoe 16-Inch Water Transmission Main

      Magnolia Center Water Main Replacement

      Sycamore Canyon Boulevard Trunk Sewer Realignment

      Pellesier Ranch (Center Street) Water Transmission Main


City of Moreno Valley

In the past 22 years, we have provided extensive services to the City of Moreno Valley Public Works Department and Capital Projects Division. This work includes Preliminary Geotechnical Investigations, Percolation Feasibility Studies, Phase I Environmental Site Assessments, and a wide variety of Construction Materials and Laboratory Testing Services.

We have provided observation and testing services for the backfilling of infrastructural utilities, including sewer mains and waterlines, street and parking lot structural sections, and dry utilities. We also have conducted testing and inspections during placement of asphalt concrete and for Portland Cement Concrete for several major City of Moreno Valley projects.

We have been awarded over 200 projects and have contracted over $500,000 in the past ten years. We have been also chosen for the Annual On-Call Geotechnical Service Agreement for several years running. Some of these projects awarded include:

      Sunnymead Boulevard Beautification Project

      Frederick/Pigeon Pass Street Improvements

      Heacock Street Improvement Project

      Graham Street Improvement Project

      Pan Am Boulevard Sidewalk Improvements

      Citywide Pavement Resurfacing Program

      Ironwood Avenue/Box Springs Road Street Improvements

      Moreno Valley Community Park

      Soccer Field Renovations

      Veterans Memorial Project

      Electrical Substation & Switch Yard;

      Street Improvement Program of Private Streets

      Boeing Street and McDonnell Street Sidewalk Improvements

      Public Safety Building Fire Sprinkler Project

      Pepper Street Improvements

      Perris Boulevard Widening, Median, and Street Improvements

      Alessandro Boulevard Sidewalk Improvements

      TEA 21 Aqueduct Bike Trail Improvements

      Eucalyptus Avenue Sidewalk Project

      Fiscal Year 2001/2002 Annual Slurry Seal Program

      Fiscal Year 2003/2004 Annual Pavement Resurfacing Project, etc.


City of Indio

We have also conducted extensive work for the City of Indio and Indio Water Authority. This work includes Preliminary Geotechnical Investigations, Pavement Evaluations, and a wide variety of Construction Materials Testing Services.

We have conducted testing and inspections during placement of asphalt concrete and for Portland Cement Concrete. We have also provided observation and testing services for the backfilling of infrastructural utilities, including sewer mains and waterlines, street and parking lot structural sections, and dry utilities for several City of Indio projects.

In the past two years, we have been awarded several significant projects and have contracted over $330,000. These projects include:

      Highway 111 Landscape Project

      Interstate 10/Jackson Street Interchange Traffic Signal  Installations and Freeway Ramp Widening

      Highway 111 Street Improvements, from Jefferson Street to Madison Street

      Avenue 46 Pavement Rehabilitation, from Madison to Monroe Streets

      Coachella Canal Improvements

      Avenue 44 at Golf Center Parkway Storm Drain and Intersection Improvements

      Madison Ave Improvements, Between Miles Ave and Fred Waring Drive

      Carreon Boulevard Street Improvements

      Area # 4 Pump Station, New Generator Pad

      All American Canal at Madison Street and Avenue 50

      Avenue 42 Street Improvements, from Spectrum Street to Golf Center Parkway

      Avenue 45 Trunk Line Sewer Improvements, Phase II

      Phase 4A, Waterline and Street Improvements Along Avenue 42

      Phase 4B, Segment 1 Monroe Street, from Ave 42 to Ave 40

      Waterline, Highway 111, from Jefferson Street to Monroe Street


City of Perris

We have provided various services to the City of Perris in excess of $120,000. Our services include a wide variety of Geotechnical and Construction Materials Testing Services.

We have conducted testing and inspections during placement of asphalt concrete and for Portland Cement Concrete. We have also provided observation and testing services for the backfilling of infrastructural utilities, including sewer mains and waterlines, street and parking lot structural sections, and dry utilities.

      D Street and San Jacinto Avenue Intersection

      Boulevard and Citrus Avenue Meandering Sidewalk Installation

      Downtown Sewerline Project Phase 3

      Goetz Road Street Improvements Between Napes and Ethanac Roads

      Indian Avenue and Goetz Road Street Improvements

      Evans Road Street Improvements

      Phase III 'D' Street Rehabilitation

      Senior Center Abandoned Structure Removal

      'G' Street, 7th Street, and Redlands Ave Street & Sidewalk Improvement

      Redlands Avenue Street Improvements

      Perris Boulevard Rehabilitation Nuevo Road to Ramona Expressway

      Community Development Block Grant Program, Sidewalk Improvements

 

Continued Client List


Developers    

      Centex Homes

      Del Webb, California Corporation

      General Dynamics

      Granite Homes

      Highland Fairview Properties

      Highpointe Communities

      Hutton Construction

      JMS Properties

      KB Home

      LB/L SunCal Victor Valley

      Lennar Partners

      Lewis Operating Corp.           

      Oak Valley Partners

      Pacific Century Homes

      Professor’s Capital

      Pulte Homes

      Richmond American homes

      Rox Consulting Group

      Ryland Homes

      Southern California PGA

      Spring Pacific Properties

      Steven Walker Homes

      Tanamera Homes

      United Strategies

      Van Daele Development Corporation


Engineers/Architects

      AEI-CASC Engineering, Inc. 

      Black & Veatch

      CalWest Consultants, Inc.

      Dudek & Associates

      Epic Engineers

      Gary S. Rasmussen & Associates

      Harris & Associates

      Holmes & Narver

      John Egan & Associates

      The Keith Companies

      Kenneth R. King

      L.D. King, Inc.

      Ludwig Engineering, Inc.

      Musil Perkowitz, Ruth, Inc.

      P&D Technologies

      PBS&J

      PCH Architects

      Power Engineers

      Proactive Engineers

      Sitetech, Inc.

      SPM Architects

      So & Associates, Inc.

      Southland Engineering

      Terra Geosciences

      Tetra Tech/ASL

      Thatcher Engineering & Associates, Inc.

      Tom Dodson & Associates

Contractors

      ABC Developers

      Gentosi Builders, Inc.

      Herman Weissker, Inc.

      Kiewit Pacific Company

      Larry Jacinto Construction

      New Height Construction

      Parsons Infrastructure & Technology Group, Inc.

      Wieland Davco Corporation


Agencies/Institutions

      Apple Valley Unified School District

      Big Bear Community Service District

      Chino Unified School District

      City of Adelanto

      City of Big Bear Lake

      City of Chino Hills

      City of Desert Hot Springs

      City of Garden Grove

      City of Hesperia

      City of Highland

      City of Indio

      City of La Quinta

      City of Lake Elsinore

      City of Loma Linda

      City of Moreno Valley

      City of Pomona

      City of Redlands

      City of Riverside

      City of San Bernardino

      City of Palm Springs

      City of Palm Desert

      City of Perris City of Temecula

      City of Upland

      City of Victorville

      City of Yorba Linda

      City of Yucaipa

      Department of Building and Safety- San Bernardino County

      Department of Solid Waste- San Bernardino County

      Office of Special Districts- San Bernardino County

      Eastern Municipal Water District

      East Valley Water District

      Indio Water Authority

      March Joint Power Authority

      Metrolink

      Norcal

      Nuevo Water Company

      Nuview School District

      Redlands School District

      Resolution Trust Company

      Riverside County Flood Control

      San Bernardino County Sheriff

      San Manuel Band of Serrano Mission Indians

      Secure Savings Bank

      Union Bank of California

      United States Air Force – George Air Force Base

      University of Redlands

      University of California - Riverside

      Ventura County National Bank

      Victor Valley County Water District

      Western Heights Water Company

 

Testimonials

“C&C Development has been very pleased with our relationship with LOR. We have used them for preliminary soils exploration, construction testing, and environmental site assessments. They have always provided prompt, reliable, and professional service at reasonable prices. They are always responsive to our needs and are always looking out for the best interest of their client.” 

-Todd Cottle, Principal

 

“I have used their services on both geotechnical investigations and material testing for many years and they have always provided prompt and excellent services. The geotechnical reports are concise and easy to understand. They are available to answer any of our questions and/or provide follow-up information while staying within the original budget.”

- Gary Solsona, PE, Public Works Manager, PENCO Engineering

 

“LOR Geotechnical has been providing high quality service to Harris & Associates for over 20-years on a wide variety of civil engineering design projects. Their staff have always been great to work with, responsive and often go beyond the call of duty by providing numerous alternative design parameters, such as multiple roadway reconstruction sections in real time during the heat of design."

 - Randall Berry, PE, Director, Engineering Services, Harris & Associates.